WCPI search results

[new search]

1 result

Display as: brief entry full entry data grid

add to order
image no.: 12644
contact sheet: A0391
collection: Major L.J. Charles Collection
description: Building An Embankment Was Commenced At Grade Elevation Between Cut & Fill, Then Carried Forward At The Top Of Fill Elevation As Shown On The Slope Stakes. As The Wagon Load Was Driven Ahead Over The End, The Dump Foreman, Standing With A Shovel, Which He Seldom Had To Use If He Was On The Job, Would Shout "High" For The Teamster To Dump His Load And Drive On Down The Slope And Then Return To The Grader For Reloading
subject(s): ConstructionHorsesRailways
date: 1910c